Skip to main content

Rib Rock Landscape Block Provides Time and Costs Savings with Tightened Construction Schedule

Jan 07, 2021

Hilly lots require additional planning during development to ensure changes in elevation will not impact the structural integrity of the buildings and structures placed on them. As this commercial lot was developing, the business owner, who has background in infrastructure and construction, saw the need for a Segmental Retaining Wall (SRW) to hold back the earth in an effort to prevent washouts and costly property damage. With time and costs savings as top priorities, the business owner contacted County Materials to find a solution that could be implemented quickly with minimal disruptions to business.

Tags:

Landscape