Skip to main content

Rib Rock Landscape Block Provides Time and Costs Savings with Tightened Construction Schedule

Nov 04, 2020

County Materials manufactures oversized segmental retaining wall solutions to meet the demands of any project. With Rib Rock Landscape Block, this business owner was able to cover more square footage faster with less material and smaller crews. Rib Rock units’ substantial weight and interlocking design provides ultimate structural integrity, leading to a prolonged service life and greater customer satisfaction.

Tags:

Landscape